zvowell
Fri, 12/23/2022 - 08:09
Edited Text
REVISED PIPE LINE GOING TO RESERVOIR SITE HILL EIGHTEEN EIGHTEEN THENCE ONE BRANCH TO CAMP AND ONE BRANCH TO INTERSECT PRESENT LINE BETWEEN OLD RESERVOIR AND POWER HOUSE INCREASING HEAD FOR POWER PLANT AND GIVING YOU WATER FOR CAMP, FOUNTAIN SYSTEM AND WATERING. COST OF THIS PIPE LAID APPROXIMATELY THIRTY-FIVE THOUSAND DOLLARS. COST OF RESERVOIR ON HILL EIGHTEEN EIGHTEEN APPROXIMATELY FIVE THOUSAND TWO HUNDRED DOLLARS. CHANGE OF WATER WHEEL WILL COST APPROXIMATELY ONE THOUSAND FIVE HUNDRED DOLLARS. NEW ELECTRIC GAS ENGINE WITH TANKS SWITCH BOARDS, ETC. WILL COST APPROXIMATELY TWELVE THOUSAND THREE HUNDRED DOLLARS. A SHEET METAL BUILDING WITH FOUNDATIONS FOR ENGINES APPROXIMATELY FOUR THOUSAND TWO HUNDRED DOLLARS. PHILLIPS THINKS CAN BE READY JULY FIRST IF WE CAN GET PIPE AND ENGINE ON BOAT SAILING TWENTY-FOURTH. NEXT SAILING VERY INDEFINITE.