Engineering - 013

Document
    Item Description
    Local Identifier
    uafac_2009-0005_0015
    Collection Number
    Series
    Campus Plans and Drawings
    Date Created
    1983-07-18
    Description

    Engineering (Bldg 013) Completion Date: 1985 Square Feet: 62,674 Architect: Arendt, Mosher, Grant, Pedersen, Phillips Architects General Contractor: Swinerton & Walberg Construction System: Concrete and steel frame, concrete exterior, tile roof Construction Cost: $8,500,000 Architectural Style: Late International Style Cal Poly President: Warren J. Baker (1979-Present) The Late International Style remained after the International Style became less prevalent. Its characteristic features are less rigid and austere than the earlier International Style.;

    Resource Type
    Use and Reproduction
    Notice regarding copyright of materials available online: http://lib.calpoly.edu/support/policies/sca-policies/copyright-guidelines/#online-copyright