SITE DEVElDPMrnT PROJ~T 1958 - 59 Budget Request 1. 2. Construct 45' asphalt perimeter road between new gymnasium and existing mountain dormitories. Construct 45' asphalt entrance road between soutb em of Residence Hall A27M and road in Item #1 above. 3. Construct asphalt parking lot east of new residence 4. Construct temporary redrock parking lot east of Science and Classroom Building. 5. Construct 8" sewer line between existing manhole north of California Boulevard and the railroad underpass at }ott. Bishop Road. 6. Install additional booster pump at existing pump house. 7. Install street lights along perimeter road, entrance road, an:! mountain dormitory parking lot as indicated. (Total 26 lights.) haJ.J.~.